No Bidang dan Jenis Proyek Lokasi Sifat Volume     Target Sasaran  Manfaat /tujuan Waktu Pelaksanaan Biaya dan sumber Dana Keterangan
Bidang Jenis B R L  Jumlah (Rp)  Sumber
1 2 3 4 5 6 7 8 9 10                   11 12 13
SARANA PRASARAN / FISIK
1   MAKADAM JALAN RT.01 V     200M X 3M 41 KK 60 HARI       25.000.000 APBD II 2016
2   MAKADAM JALAN RT.02 V     250M X 2,5M 28 KK 60 HARI       30.000.000 APBD II 2016
3   MAKADAM JALAN RT.04 V     1,2KM X 2,5M  71 KK 60 HARI     133.000.000 APBN 2014
4   MAKADAM JALAN RT.05 V     300M X 2,5M 32KK 40 HARI       39.000.000 APBD II 2015
5   MAKADAM JALAN RT.05 V     200M X 2,5M 32 KK 30 HARI       25.000.000 APBD II 2015
6   MAKADAM JALAN RT.06     V 1000M X 2,5M  49 KK 90 HARI     250.000.000 APBD II 2015
7   MAKADAM JALAN RT.09     V 500M X 2,5M 35 KK 50 HARI       60.000.000 APBD II 2016
8   MAKADAM JALAN RT.10 V     800M X 2,5M  57 KK 60 HARI       90.000.000 APBD II 2014
9   MAKADAM JALAN RT.10 V     800M X 2,5M 60 KK 60 HARI       90.000.000 APBD II 2017
10   MAKADAM JALAN RT.11 V     1,5KM X 3M 35 KK 120 HARI     199.000.000 APBD II 2016
11   MAKADAM JALAN RT.11 V     200M X 2,5M 33 KK 25 HARI       25.000.000 APBD II 2016
12   MAKADAM JALAN RT.12 V     500M X 3M 28 KK 30 HARI       66.000.000 APBN 2016
13   MAKADAM JALAN RT.13 V     1,9 KM X 2,5M 40 KK 120 HARI     225.000.000 APBN 2016
14   MAKADAM JALAN RT. 14     V 1,2KM X 3M  20 KK 110 HARI     160.000.000 APBD II 2015
15   MAKADAM JALAN RT.15 KE RT 14     V 1,7KM X 2,5M 65 KK 120 HARI     188.000.000 APBD II 2015
16   MAKADAM JALAN RT. 15 V     800M X 3M 33 KK 60 HARI       90.000.000 APBD II 2016
17   MAKADAM JALAN RT.16 KE SRITI V     750M X 3M 556 KK 40 HARI     100.000.000 APBD I 2017
18   MAKADAM JALAN RT.16 KE PRAMBON V     600M X 3M 47 KK 35 HARI       80.000.000 APBD II 2017
19   REHAP MAKADAM RT.14 KE RT.15   V   2 KM X 3M 165 KK 130 HARI     265.000.000 APBN 2016
20   RABAT JALAN RT 01 V     750m x 2,5 m x 0,12m 30 KK 30 HARI       85.000.000 APBN 2014
21   RABAT JALAN RT 02 V     600 x 2,5 m 30 KK 25 HARI       70.000.000 APBD II 2016
22   RABAT JALAN SDN 2 RT.03 V     100 x 3 m 91 Siswa 7 Hari       30.000.000 APBN 2017
23   RABAT JALAN RT.05 - RT.06 V     800M X 3M X 0,12M 49 KK 50 HARI     200.000.000 APBN 2015
24   RABAT JALAN RT.07     V 800M X 2,5M X 0,12M 38 KK 40 HARI     200.000.000 APBN 2015
25   RABAT JALAN RT.08   V   440M X 2,5M X 0,12M 78 KK 30 HARI     150.000.000 APBN 2015
26   RABAT JALAN RT.09 V     600M X 2,5M X 0,12M 62 KK 40 HARI     190.000.000 APBN 2016
27   RABAT JALAN RT.09   V   500M X 2,5M X 0,12M 32 KK 35 HARI     170.000.000 APBN 2015
28   RABAT JALAN RT 10   V   800M X 2,5M X 0,12M 37 KK 35 HARI     200.000.000 APBN 2015
29   RABAT JALAN RT.11       200M X 2,5M X 0,12 29 KK 20 HARI       65.000.000 APBD II 2016
30   RABAT JALAN RT.13,14,15   V   1.040M X 2,5M 175 KK 60 HARI     350.000.000 APBN 2016
31   RABAT JALAN RT.15 KE RT.13 V     450M X 2,5M X 0,12 85 KK 60 HARI     200.000.000 APBN 2014
32   RABAT JALAN RT.15     V 1KM X 3M X 0,12M 73 KK 60 HARI     331.000.000 APBD II 2016
33   RABAT JALAN LINGKAR DESA DESA MASARAN       10 KM X 4M X 0,12 M 818 KK 100 HARI     900.000.000 APBD II 2015
34   RABAT JALAN RT.16 V     400M X 2,5M X 0,12M 57 KK 90 HARI     140.000.000 APBN 2016
35   ASPAL JALAN KE SOOKO RT.07       1200M 719 KK 90 HARI     300.000.000 APBN 2017
36   PEMELIHARAAN JALAN DESA DESA MASARAN   V   15 KM 719 KK       750.000.000 APBD II 2015
37   GORONG-GORONG  RT 01 V     30 BIJI ± 40 CM 60 KK 30 HARI       18.000.000 APBD II 2017
38   GORONG GORONG   RT 02 V     6 BIJI ± 60 CM 53 KK 15 HARI         1.750.000 APBD II 2016
39   GORONG GORONG RT 03   V     20 BIJI ± 60 CM 719 KK 30 HARI         5.500.000 APBD II 2016
40   GORONG-GORONG PLAT RT 04 V     3  X 2,5 M 33 KK 30 HARI       57.000.000 APBD II 2017
41   GORONG-GORONG PLAT RT 05 V     4M X  2,5MX  1,5M 49 KK 20 HARI       75.000.000 APBN 2015
42   JEMBATAN  RT 02 V     3M X 3M X 3M 27 KK 60 HARI     120.000.000 APBD II 2015
43   JEMBATAN  RT 04 V     4M X 3M X 3M 86 KK 90 HARI     140.000.000 APBN 2015
44   JEMBATAN  RT 05 KE RT 06 V     5 MX4M X 3 M 49 KK 60 HARI     160.000.000 APBN 2015
45   JEMBATAN RT 11 V     12MX12M X 3 M 45 KK 30 HARI     425.000.000 APBN 2016
46   JEMBATAN RT 11 V     4M X 3M X 3M 818 KK 90 HARI     140.000.000 APBN 2017
47   JEMBATAN RT 14 KE RT 15   V   6M X 4M X 4M 342 KK 120 HARI     200.000.000 APBN 2015
48   JEMBATAN MASARAN-SURENLOR   V   6M X 4M X 4M 818 KK 120 HARI     120.000.000 APBN 2016
49   GORONG-GORONG RT 13 V     12 BIJI ± 40 CM 40 KK 30 HARI         4.500.000 APBD II 2015
50   JEMBATAN RT 14 KE RT 15 V     6 X 4 X 6 M 165 KK 30 HARI       10.000.000 APBD II 2015
51   GORONG-GORONG RT 16 V     ± 40 CM = 24 BH 33 KK 30 HARI       50.000.000 APBD II 2015
52   PLENGSENGAN  RT 07 V     150 X 2,5 M 30 KK 30 HARI       60.000.000 APBD II 2016
53   PLENGSENGAN  RT 01 V     30 X 4 M  30 KK 90 HARI       90.000.000 APBD II 2017
54   PLENGSENGAN MUSHOLLA RT 03 V     20 X 1 M 30 KK 60 HARI       25.000.000 APBD II 2017
55   PLENGSENGAN  GEDUNG TK RT 03 V     20 X 1 M 30 KK         30.000.000 APBD II 2014
56   PLENGSENGAN RT 05  V     150 X 5 M 719 KK 30 HARI       68.000.000 APBD 2015
57   PLENGSENGAN RT 08 V     100 X 5 M 719 KK 30 HARI       68.000.000 APBD 2016
58   PLENGSENGAN MASJID INDUK RT 09 V     35 X 5 M 61KK 30 HARI       57.000.000 APBD II 2016
59   PLENGSENGAN MASJID INDUK RT 09 V     35 X 5 M 61KK 30 HARI       57.000.000 APBD II 2016
60   PLENGSENGAN JALAN PROTOCOL RT 10 V     5 X 20 M 818 KK 120 HARI       90.000.000 APBN 2016
61   PLENGSENGAN ANTAR RT 10 - RT 11 DSN MASARAN V     60 X 5 M 818 KK 180 HARI     263.000.000 APBN 2017
62   PLENGSENGAN RT 11 V     15  X 5 M 30 KK 90 HARI       65.000.000 APBD I 2017
63   PLENGSENGAN RT 13 V     30 X 4 M 145 KK 100 HARI     105.000.000 APBN 2017
64   PLENGSENGAN RT 15 V     7,5 X 4 M 65 KK 30 HARI       30.000.000 APBN 2014
65   PLENGSENGAN RT 15 KE RT 14 V     10 X7& 30 X10M 75 KK 30 HARI       23.400.000 APBD II II 2016
66   PLENGSENGAN JALAN  RT 16 DEKAT MUSHOLLA V     30 X 2 M 33 KK 60 HARI       52.500.000 APBD II 2017
67   TPJ RT 01  V     650M  X   3 M 30 KK 60 HARI     179.200.000 APBN 2016
68   TPJ RT 03 V     100M X 5M 818 KK 90 HARI     120.000.000 APBD II 2017
69   TPJ RT 04 V     58 X 20 M 31 KK 120 HARI     105.000.000 APBN 2017
70   TPJ   RT 05 V     50 X 5 M 32 KK 120 HARI     219.000.000 APBN 2015
71   TPJ RT 07 V     200M X 3M 86 KK 60 HARI       60.000.000 APBD I 2016
72   TPJ     RT 08     V 20M  X 8 M 40 KK 30 HARI       60.000.000 APBD Prov. 2014
73   TPJ RT 12 V     60 X 3 M 361 KK 90 HARI     160.000.000 APBN 2017
74   TPJ RT 13 V     10 X 5 M 130 KK 60 HARI     144.000.000 APBN 2017
75   DRAINASE  RT 01 - RT 03 V   V 1.700 M 818 KK 60 HARI     240.000.000 APBN 2016
76   TPJ RT 05     L 800 M 720 KK 30 HARI     140.000.000 APBD II 2016
77   DRAINASE RT 09 - RT 12 V     1.060 M 818 KK 90 HARI     200.000.000 APBN 2017
78   DRAINASE RT 11 V     500 M 562 KK 60 HARI       80.000.000 APBD 1 2017
79   DRAINASE RT 11 KE RT12 V     700 M 562 KK 60 HARI     180.000.000 APBD 1 2017
80   DRAINASE RT 13 V     1.500 M 99 KK 90 HARI     240.000.000 APBN 2017
81   PIPANISASI MASJID RT 05 RT 05 V     1.500 M 32 KK 90 HARI       90.000.000 APBD II 2017
82   PIPANISASI RT 10 V     1.500 M 32 KK 90 HARI       90.000.000 APBD II 2017
83   PIPANISASI MASJID  RT 11 V     250 M 29 KK 30 HARI       65.000.000 APBD II 2016
84   PIPANISASI MASJID RT 14 V     2.000 M 69 KK 120 HARI     120.000.000 APBD II 2017
85   PIPANISASI RT 15 V     700 M 33 KK 60 HARI       65.000.000 APBD II 2017
86   PIPANISASI RT 16 V     3.000 M 41 KK 30 HARI     200.000.000 APBD II 2017
87   PENAMPUNGAN AIR   MASJID  RT 05 V     1 UNIT 29 KK 30 HARI       15.000.000 APBD II 2017
88   PENAMPUNGAN AIR   MASJID  RT 11 V     1 UNIT 29 KK 30 HARI       15.000.000 APBD II 2017
89   MCK UMUM RT 03 V     1 LOKASI 69 KK 60 HARI       60.000.000 APBD II 2017
90   JAMBANISASI RT 15 V     33 BUAH 33 KK 120 HARI     100.000.000 APBN 2017
91   PENAMBAHAN JARINGAN LISTRIK RT 13 -RT 16 V     1 PAKET 120 KK 120 HARI     350.000.000 APBD II 2017
92   REHAB BALAI DESA DSN MASARAN   V   8M X 24M 750 KK 30 HARI       37.500.000 APBD II 2014
93   REHAB  MUSHOLLA RT 08     V 2 MUSHOLLA 68 KK 90 HARI     120.000.000 APBD II 2014
94   PAVING MASJID   RT 10 V     5 X 10 M 329 KK 30 HARI         4.500.000 APBD II 2017
95   REHAB MASJID RT 05     V 5 X 5 M 67 KK 120 HARI     150.000.000 APBD II 2016
96   REHAB MASJID/MUSHOLA DESA MASARAN   V   8 X 8 M 808 KK 120 HARI     150.000.000 APBD II 2017
97   REHAB MASJID RT 10     V 8 X 8 M 67 KK 120 HARI     150.000.000 APBD II 2017
98   REHAP TERAS MUSHOLA RT 12     V 2,5 X 6 M 35 KK 30 HARI       60.000.000 APBD II 2017
99   REHAP MUSHOLLA  RT 15     V 6  X  6 M 33 KK 120 HARI       55.000.000 APBD II 2017
100   REHAP TERAS  MUSHOLLA RT 16     V 2,5 X 6 M 41 KK 60 HARI       25.000.000 APBD II 2017
101   PENINGKATAN JALAN MASARAN -SURENLOR   V   4X 300M 818 KK 120 HARI     800.000.000 APBD II 2015
102   PENINGKATAN JALAN MASARAN - SRITI V     3 X 1200 808 KK 120 HARI     600.000.000 APBD 2016
103   PENINGKATAN JALAN MASARAN - NGADIROJO V     4 X 2000 808 KK 120 HARI     800.000.000 APBD 2016
104   TPJ  JALAN PROTOKOL V     60M X 3M  816 KK 120 HARI     400.000.000 APBD 2016
105                        
106   PEMELIHARAAN MASJID DAN MUSHOLA DESA MASARAN     V 16 MASJID/MUSHOLA 818 KK 3 TAHUN     300.000.000 APBD II 2014-2017
SOSIAL DAN BUDAYA
1   GURU NGAJI RT 02 RT 02  V     1 ORANG 24 KK 1 TAHUN          6.000.000 APBD II 2017
2   GURU NGAJI RT 03 V     1 ORANG 50 KK 1 TAHUN          6.000.000 APBD II 2016
3   SERAGAM YASINAN RT 05 V     256 STEL 36 KK 1 TAHUN        50.000.000 APBD II 2017
3   SERAGAM YASINAN RT 11 DAN RT 15 V     256 STEL 256 KK 1 TAHUN        50.000.000 APBD II 2017
4   HONOR TENAGA PENGAJAR MADIN RT 14 V     2 ORG. PENGAJAR 110 KK 1 BULAN           600.000 APBD II 2017
5   LAP. SEPAK BOLA DAN BOLA VOLLY  MASARAN WETAN V     1 LOKASI 240 KK 30 HARI       25.000.000 APBD II 2017
6   BOLA  VOLLY LENGKAP MASARAN WETAN V     3 SET 2 KELOMPOK 1 TAHUN        12.000.000 APBD II 2017
8   PERLENGKAPAN KESENIAN JARANAN MASARAN WETAN V     2 UNIT 190 KK 1 TAHUN      100.000.000 APBD II 2017
10   SOUND SYSTEM MUSHOLLA DSN MASARAN V     2 UNIT 70 KK 1 TAHUN          5.000.000 APBD II 2015
11   KURSI PLASTIK RT 05 V     600 BUAH 36 KK 1 TAHUN        15.000.000 APBD II 2017
11   KURSI PLASTIK RT 11 - RT 16 V     600 BUAH 369 KK 1 TAHUN        30.000.000 APBD II 2017
12   SOUND SYSTEM  JARANAN RT 13 - RT 15 V     1 UNIT 120 KK I TAHUN       45.000.000 APBD II 2016
13   KWH METER PENERANGAN MAKAM RT 05 V     1 UNIT 423 KK 1 TAHUN        15.000.000 APBD II 2015
13   KWH METER PENERANGAN MAKAM DUSUN JUMOK V     1 UNIT 423 KK 1 TAHUN        15.000.000 APBD II 2015
14    ALAT MUSIK HADROH RT 05 V     1 UNIT 36 KK 1 TAHUN        25.000.000 APBD II 2016
14    ALAT MUSIK HADROH DSN JUMOK V     1 UNIT 35 KK 1 TAHUN        25.000.000 APBD II 2016
15   ALAT MUSIK CAMPUR SARI DUSUN JUMOK V     1 PAKET LENGKAP 1 KELOMPOK 1 TAHUN        30.000.000 APBD II 2017
16   TEROP JARANAN RT 13, 14, 15 V     1 UNIT 120 KK 1 TAHUN        30.000.000 APBD II 2017
19   PEMUGARAN RUMAH DESA MASARAN V   V 3 DUSUN 200 KK 1 TAHUN      600.000.000 APBD I 2016
20   ALAT KESENIAN JARANAN DESA MASARAN V     3 SET  3 KELOMPOK 1 TAHUN        30.000.000 APBD II 2017
21   BOLA VOLLY DESA MASARAN V   V 7 TIM 144 ORANG 1 TAHUN        60.000.000 APBD II 2017
22   ALAT KESENIAN HADROH DESA MASARAN V     7 KELOMPOK 72 ORANG 1 TAHUN        30.000.000 APBD II 2017
23   BANTUAN ANAK YATIM/PIATU DAN LANSIA TERLANTAR DESA MASARAN V     3 DUSUN 150 ORANG 1 TAHUN      175.000.000 APBD I 2015
24   PEMBANGUNAN POS KAMLING DESA MASARAN   V   16 UNIT 2404 ORANG I TAHUN     160.000.000 APBD II 2017
25   BANTUAN SOSIAL KEAGAMAAN DESA MASARAN     V 16 UNIT 2404 ORANG I TAHUN     117.000.000 APBD II 2015
26   ALAT KESENIAN WAYANG KULIT DESA MASARAN V     1 KELOMPOK 20 ORANG 30 HARI       30.000.000 APBD II II 2017
27   BANTUAN MASYARAKAT MISKIN DESA MASARAN     V 3 DUSUN 663 ORANG I TAHUN     397.800.000 APBN 2015
28   PLESTERISASI DESA MASARAN V     3 DUSUN 60 UNIT I TAHUN     500.000.000 APBN 2015
PENDIDIKAN
1   GEDUNG SMP SATU ATAP SDN 1 MASARAN V     7 X 8 M ( 3 R ) 234 SISWA 3 TAHUN     300.000.000 APBD II 2014-2017
2   GEDUNG TK, TENAGA PENGASUH SDN 1 MASARAN V     7 X 8 M (2 ORANG ) 234 SISWA 3 TAHUN     200.000.000 APBD II 2014-2017
3   GEDUNG LABORATORIUM SDN 1 MASARAN V     7 X 8 M 234 SISWA 3 TAHUN     150.000.000 APBD II 2014-2017
4   DRAINASE SDN 1 MASARAN V     50 M 234 SISWA 3 TAHUN       20.000.000 APBD II 2014-2017
5   UANG SAKU SDN 1 MASARAN V     31 ANAK 234 SISWA 3 TAHUN         5.000.000 APBD II 2014-2017
6   ATK SDN 1 MASARAN V     134 ANAK 234 SISWA 3 TAHUN           700.000 APBD II 2014-2017
7   GEDUNG TK, TENAGA PENGASUH SDN 2 MASARAN V     7 X 8 M (2 ORANG ) 234 SISWA 3 TAHUN     200.000.000 APBN 2014-2017
8   GEDUNG LABORATORIUM SDN 1 MASARAN V     7 X 8 M 234 SISWA 3 TAHUN     150.000.000 APBN 2014-2017
9   UANG SAKU SDN 2 MASARAN V     31 ANAK 234 SISWA 3 TAHUN         5.000.000 APBD II 2014-2017
10   SERAGAM SEKOLAH SDN 1 MASARAN V     134 ANAK 234 SISWA 3 TAHUN         6.500.000 APBD II 2014-2017
11   PMT SDN 1 MASARAN V     100 X/TH 234 SISWA 3 TAHUN       26.000.000 APBD II 2014-2017
12   PENAMBAHAN PENERIMAAN UANG BOS SDN 1 MASARAN V     134 ANAK @35.000,- 234 SISWA 3 TAHUN         5.000.000 APBN 2014-2017
13   GEDUNG LABORATORIUM SDN 2 MASARAN V     7 X 8 M 91 SISWA 3 TAHUN     150.000.000 APBN 2014-2017
14   REHAB RUANG KELAS SDN 2 MASARAN   V   7 X 8 M ( 4 RUANG ) 91 SISWA 3 TAHUN       90.000.000 APBN 2014-2017
15   REHAB MCK SDN 2 MASARAN   V   5 X 2,5 M 91 SISWA 3 TAHUN       20.000.000 APBD II 2014-2017
16   KIT IPA SDN 2 MASARAN V     3 SET 91 SISWA 3 TAHUN         6.000.000 APBD II 2014-2017
17   GLOBE SDN 2 MASARAN V     6 BUAH 91 SISWA 3 TAHUN         1.500.000 APBD II 2014-2017
18   BUKU TEKS BI KLS. 1 - 6 SDN 2 MASARAN V     @ KELAS 15 EKS. 91 SISWA 3 TAHUN         1.000.000 APBD II 2014-2017
19   BUKU PAKET LENGKAP SDN 1/SDN 2 MASARAN SDN 2 MASARAN V     @ KELAS 15 EKS. 125 SISWA 3 TAHUN       15.000.000 APBD II 2014-2017
20   LAPTOP SDN 2 MASARAN V     7 BUAH 91 SISWA 3 TAHUN       35.000.000 APBD II 2014-2017
21   MEJA KURSI MURID SDN 2 MASARAN V     30 STEL 91 SISWA 3 TAHUN         5.000.000 APBD II 2014-2017
22   PAPAN TULIS SDN 2 MASARAN V     6 BUAH 91 SISWA 3 TAHUN           600.000 APBD II 2014-2017
23   GEDUNG MUSHOLLA SDN 2 MASARAN

Komentar atas Dokumen RPJM Desa Masaran 2011-2017

Formulir Penulisan Komentar

Nama
Alamat e-mail
Komentar
 

Layanan Mandiri


Silakan datang / hubungi perangkat Desa untuk mendapatkan kode PIN Anda.

Masukkan NIK dan PIN!

Media Sosial

FacebookTwitterGoogle PlussYoutubeInstagram

Statistik Kunjungan

Hari ini
Kemarin
Jumlah pengunjung

Lokasi Masaran

tampilkan dalam peta lebih besar